How We Build LED Drivers

Five production steps, one inspection gate after each. Every number below is a line we actually run — not a capability we would like to claim.

Summary

Towe manufactures LED drivers in a 4,000 m² plant in Zhongshan, Guangdong, with 100 staff and three automated production lines. Components pass incoming inspection, run through SMT and lead-free wave soldering, receive computerised in-circuit test, are assembled into aluminium housings with silicone semi-potting or full potting, then every single unit runs 100% full-load high-temperature aging on ten racks before final test and packing. The line holds a production pass rate above 99% and a field failure rate at or below 0.03%.

Production flow

From component to carton, in five steps

StepWhat happensInspection gate
1 · Incoming material Transformers, capacitors, ICs and housings checked against the approved vendor list before release to the line. Reel-level traceability, first-article on new lots
2 · SMT + wave solder Three automated lines run SMT placement and wave soldering; lead-free process throughout for RoHS. Computerised ICT on every board before assembly
3 · Assembly + potting Board into extruded or die-cast aluminium housing, then silicone semi-pot or full pot depending on series. Pot depth and cure checked per batch; hipot on every waterproof unit
4 · 100% full-load aging Every unit runs at rated power on 10 high-temperature aging racks. No sampling plan, no skipped batches. Pass rate above 99% at final QC
5 · Final test + packing Output voltage, load and insulation re-checked, then cartoned with the tested quantity per carton. 0.03% field failure rate across shipped volume
What we do not do

The honest limits

Buyers get burned more often by an undisclosed gap than by a stated one. These are the things to route elsewhere.

No die or mould tooling

Housings are existing extrusions and die-cast profiles. A completely new housing needs a tool, quoted separately with a 25–35 day lead time.

No DALI-2 certification

We build 0–10 V, triac and MESH 2.0 control. A project that specifies DALI-2 certification needs a different platform, and we will say so at quotation.

No sub-zero cold-start guarantee

Standard series are rated for normal ambient. Below −20 °C, ask before ordering — the electrolyte and the potting compound both need a different specification.

Want the production evidence?

Ask for the aging rack log, the ICT yield trend, or a video walkthrough of the line during your order. We send it before you place a deposit, not after.